Wednesday 12 May 2010

Laying of wall tiles

Before priming, the primed sub-floors. If you want to lay tile in your bathroom with a brush or adhesive primer emulsion crawl depth. Lower floors clean, dry and above all must have sufficient capacity. If there is wallpaper on the lower floor of which must necessarily be removed. Morphology of other recovered with a spatula. After applying the primer or adhesive emulsion depth of at least three hours to wait for them to dry.

Determination of main line: draw a vertical and a horizontal main line.
This pencil lines, aligned with the help of rope and water balance are marked correctly, the next steps, particularly for your work is essential. According to this marked the first tile and then start placing your order. On these lines before the tiles horizontally and vertically and then, standing upside down to get a T-shape must place.

In the selection of tile adhesives Adhesives: tile to be placed on the floor of your pay careful attention to which sub. Gypsum plaster or plasterboard panels, brick walls and concrete tiles on the wall tiles are sold for sticking with traditional adhesives. New tiles over old tiles or waterproof if you want to paste it on the work bench, a high adhesive force produced for media are optional. Normal adhesives on the market are sold as ready to use. Suylla them or mix with an additive. A few minutes short maturation period and is once again ready mixed adhesives. Tile adhesive mix thoroughly with a toothed spatula. Now have a new mix session tile adhesive onto the dried primer as your start time. Adhesive on the lower ground running with a trowel. During this process, while the adhesive is uniform and above all must ensure that a smooth surface oluştugundan. Tile adhesive at room temperature depending on the duration of your work Do not forget to check the back of your tiles before you begin. If these surface intensively big toothed spatula Select profile. Dental spatulas, laying tiles during the tile adhesive on the back surface of at least 80% must be chosen to be soaked with glue.

Laying of tiles: floor tiles, you can start now. Push tiles into the adhesive bed. When laid on occasion (of tile nippers), open edges. A tile pipe in the middle of the back of the tile surface from 80% check if wetting is not whether the wet. You placed a new one by removing the tiles and make random. If you use your tile cross joint coatings have uniform joint ranges.

Tiles to be placed around the pipe: a pipe through joints, if the parrot beak (of tile nippers), open edges. If the pipe passes through the middle of a tile, tile divided into two equal parts and then carefully place the pipe open at the edge of the track. Rubber thread and cord suterazisi near the corner of the tile is a practical tool for alignment. When laying tile tile adhesive to the back of your landscape has been established and with soaking wet is not whether the constant check. If you find a small flaw, the pasted material correction period, due to the absorption capacity of the lower floors and tiles of thought. It is best to fix that immediately. The doors and windows near the floor or ceiling tiles in the environment will need to cut this work, prior to continuing to make glue.

Review: the new paved surface now have all the walls in your bathroom. Wait until the glue hard, hardening time, read through the package. After the grout joints with water, the mix will become a thick syrup. Sponge rubber or wooden mortar joints with a joint press it into the joint. Overflowing with material taken diagonal, ie, the stripping cross the joints. Joints in a dull, wait until dry. After the tile surface moist, but not too wet with a sponge can be cleaned by moving the cross. Foam during the cleaning process wash too often. Then, once again, your new floor tiles have a clean and dry cloth.

0 comment:

Post a Comment

Search on this Blog

Özel Arama